# 2x2 Grid: plot items on two axes

> Participants rate each item on two axes, such as effort and impact, and the big screen plots the average position of every item on a 2x2 grid.

URL: https://learnworkly.com/help/interactive-slides/2x2-grid · Updated 2026-11-17

A **2x2 Grid** analyses responses on two dimensions at once. Classic uses are effort versus impact, urgency versus importance, or confidence versus interest.

## Set up a grid

1. **Add the slide** In the editor, click **+ New Slide**. In **Choose Slide Type**, open the **Interactive** tab and pick **2x2 Grid**.
2. **Write the question** For example "Rate each idea on effort and impact".
3. **Add the items** Under **Options**, add each item to be plotted, up to 9.
4. **Name the axes** Under **Settings**, **Grid Dimensions**, fill in **X Axis Label** and **Y Axis Label** (by default "Effort ➔" and "Impact ➔"), and set **X Axis Min**, **X Axis Max**, **Y Axis Min** and **Y Axis Max** (0 to 10 by default).

*[Screenshot: The 2x2 Grid editor with Grid Dimensions: X and Y axis labels and their minimum and maximum values]*

## Run it live

1. **Present the slide** Click **Present**. People join at **join.learnworkly.com** with your code or the QR code, and the slide appears on their phones.
2. **People rate each item** For each item, the phone shows two sliders, one per axis. Participants set both for every item and press **Submit**.
3. **Read the grid** The big screen plots each item at the average of everyone’s answers, split into four quarters.

*[Screenshot: The 2x2 grid on the big screen with four ideas plotted by average effort and impact]*

*[Screenshot: A phone with an effort slider and an impact slider for each idea]*

## Other settings

You can also ask for a name, email or avatar, and use **Hide result** and **Stop Submission**: see [Response settings](https://learnworkly.com/help/settings/response-settings). This slide has no time limit: use **Stop Submission** to close it.

## Results in the report

After the session, open the presentation’s report (the report button in the editor’s top bar, or **Report** in your presentation list) and go to **Slide Results**. See [Read the report of a presentation](https://learnworkly.com/help/reports/presentation-reports). The report lists each item with its average position on both axes.

## Frequently asked questions

**Which quarter is "good"?**
That depends on your axes. With effort and impact, the quick wins are low effort and high impact.

**Can I change the axes after people answered?**
You can, but answers keep their numbers. Change the labels and ranges before you present.

**How many items should I plot?**
Up to 9. Each item needs two sliders on the phone, so fewer items are quicker to answer.
